How long it takes to build a business website
By Tony Juraska, founder of Digital Service Solutions/Reviewed
The short answer
A small business site of five to ten pages typically takes two to six weeks from kickoff to launch, and a larger site with a blog or location pages takes six to twelve. The build itself is rarely the slow part. Waiting on content, photos, logins and approvals is what stretches most projects.
The phases and what happens in each
Discovery (2–5 days)
Services, service area, competitors, what a good lead looks like. Ends with a page plan.
Content (1–3 weeks)
Copy drafted and approved, photos gathered. This is where most delays happen.
Design and build (1–3 weeks)
Pages built with real content, phone layout first. You review a working preview link, not static mockups.
SEO and tracking (2–4 days)
Titles, schema, redirects from any old site, analytics events, Search Console.
Test and launch (1–3 days)
Every form and phone number tested, DNS switched, old URLs checked, sitemap submitted.
Typical ranges by project type
| Project | Typical range | What drives it |
|---|---|---|
| 1–5 page site (Wix or custom) | 2–4 weeks | Copy and photos |
| 5–10 page WordPress site | 3–6 weeks | Number of service pages |
| Redesign with redirects | 4–8 weeks | Size of the old URL inventory |
| 20+ page growth site with blog | 6–12 weeks | Content production |
| Online store | 4–10 weeks | Product data and shipping rules |
| Custom web application | Scoped in phases | Features and integrations |
What you can do to launch sooner
- Gather logins before kickoff: domain registrar, current host, Google Business Profile, analytics
- Send 20–40 real job photos up front. Phone photos are fine if they're sharp and well lit
- Pick one person to approve copy, and give them a deadline
- Decide your service list and service area before design starts
- Approve pages in batches instead of all at once at the end